Welscape · free tool for project teams
UK Whole Life Carbon Map
Where every UK whole life carbon standard, rule and target sits, who can make it a requirement on your project, and how the pieces connect. Built from the primary documents and checked against official and trade sources on 25 October 2026.
- Drawing
- WLC-000
- Rev
- B
- Facts checked
- 25 Oct 2026
- Scale
- NTS
- Prepared by
- Welscape
- Next review
- Feb 2027
Regulation
Nationally, embodied carbon is still unregulated.
Part L covers operational energy only. In July 2025 the government was still "assessing the evidence". Mandatory WLCAs come from London planning, a few councils and public-sector clients.
Method
One method sits under almost everything.
The RICS PS 2nd edition, built on EN 15978, is what the GLA, NZCBS, BREEAM V7, LETI, the NHS and NISTA point to. Build one compliant model and report it several ways.
Comparability
Numbers only compare when scopes match.
Modules, elements, floor area, sequestration and year all move the figure. A LETI band, a GLA benchmark and an NZCBS limit measure different things.
Claims
"Net zero" now has a referee.
NZCBS verification opened in July 2026, with claims only after a year in use. The CMA has been able to fine misleading green claims since April 2025.
Section A-A
How the pieces stack
Read it from the bottom up: international standards feed the UK methods, the methods feed the targets, and the top row is everyone who can make it a requirement on your project. Pick a box to see what it is, whether it's mandatory, and what it connects to.
Schedule 1
Is it mandatory? It depends who's asking
The same building can face no carbon rules at all, or three sets of them, depending on where it is and who is paying. Symbol colour shows who imposes the requirement.
Schedule 2
Same words, different numbers
Why a LETI band, a GLA benchmark and an NZCBS limit can't be compared directly: each one counts different life cycle modules and building elements.
Rule
Build the model once, to the full RICS scope, then filter it for each scheme. Never carry a number from one scheme into another without re-cutting the scope. Welscape view
Detail 1
Client brief builder
Answer four questions about your project to see what's required by law or planning, what your own choices add, and the approach Welscape recommends. An example is loaded; change any answer.
Programme
When each one bites
RIBA Plan of Work stages across the top. Most of the carbon is decided before most schemes ask for a number.
Detail 3
Circular economy: the sister system
Circular economy has its own rules, but it shows up in the carbon numbers in specific places. This is where, and which circular rules can actually be forced on a client.
Can be made a requirement
- Waste law, everywhere: waste hierarchy and duty of care.
- GLA Circular Economy Statement (SI 7) on referable London schemes.
- Westminster Policy 43 Retrofit first (adopted Jan 2026).
- City of London WLC optioneering advice note (2023) for majors and major demolition.
Voluntary
- BREEAM waste and materials issues (check the V7 manual for numbering).
- BS 8001:2017 and ISO 59004 / 59010 / 59020 (2024).
- LETI's Circular Economy one-pager (2022) and Retrofit vs Rebuild Unpicker (2023).
- EU Level(s) circularity indicators General knowledge, not re-checked
Shared data
The bill of materials is one dataset serving two submissions. In London, modules C3 and D of the WLCA are meant to come from the Circular Economy Statement (GLA guidance 3.2.2).
PAS 2080 order of play
PAS 2080:2023 clause 4.3: apply in that order. Circular economy sits in "improve"; retaining an existing building is an "avoid" move.
Case
M&S Oxford Street. Called in and refused in July 2023, with retrofit and carbon central to the inquiry Moderate confidence. The High Court quashed that refusal in early 2024, and on 5 Dec 2024 the Secretary of State approved demolition, saying she did "not consider that it is possible to come to a definitive conclusion" on whether refurbishment would have less embodied carbon. Carbon only wins the argument when the retain vs rebuild comparison is early, like-for-like and robust.
Revisions
What's changing
The dates that move this map, 2023 to 2030. Proposed or EU-only items have dashed outlines.
References
Sources and confidence
Facts come from the documents themselves or from web sources checked on 25 Oct 2026. Anything that is Welscape's judgement or an interpretation is tagged where it appears.
Next step
Got a carbon target and not sure which of these applies?
Welscape helps contractors, developers and design teams work out what is actually required on a project, what is worth doing anyway, and when to start. Send the site location, the RIBA stage and what the client wants to achieve.
