Whole Life Carbon
What it is, who asks for it in the UK and by when
There's no national requirement in England to assess or limit embodied carbon. In March 2026 the government turned down a Commons committee's call to make whole life carbon assessments mandatory, and it has no timetable for regulation.
That doesn't mean projects escape it. In London the Greater London Authority (GLA) is the main driver: every scheme large enough to be referred to the Mayor needs an assessment at planning and after construction, and some boroughs ask for more. Outside London a few councils have their own policies. Everywhere else it comes from the client: a BREEAM V7 Excellent target, an NHS or government brief, an investor asking for data or a net zero claim.
- 3GLA stages on a referable scheme: pre-application where relevant, planning and post-construction
- 700kgCO₂e/m², the draft London Plan's upfront carbon baseline for Use Class E (offices, shops and similar) and homes 11 m or taller, due in March 2028
- 1life cycle assessment (LCA), at any stage, is a minimum standard for BREEAM V7 Excellent
- 12months in use at 80% occupancy before a building can be verified under the UK Net Zero Carbon Buildings Standard (NZCBS)
New to whole life carbon? Start here
Whole life carbon is all the greenhouse gas a building is responsible for, from making its materials to taking it down at the end. Put simply, it's the carbon of building it (embodied) plus the carbon of running it (operational).
- Carbon
- Shorthand for all greenhouse gases, not just carbon dioxide.
- CO₂e
- Carbon dioxide equivalent. Each gas is converted into the amount of CO₂ that would warm the planet as much, so they can be added up.
- kgCO₂e/m²
- Kilograms of CO₂e per square metre of floor area, so buildings of different sizes can be compared.
Stuck on a term further down? The jargon buster explains every abbreviation on this page.
Why it matters
- 25%of UK emissions come from the built environment, by UKGBC's figures.
- 40 to 50million tonnes of CO₂: the embodied carbon of the UK built environment in 2021, more than aviation and shipping combined (UKGBC figures, quoted by BCIS).
- 33%of contractors in a 2024 Rider Levett Bucknall survey said clients were asking them for whole life carbon assessments, up from 14% the year before (quoted by BCIS).
A building's life, in stages
Every assessment splits the life of a building into the same stages, each with a code. The codes turn up in every report and every target on this page, so they're worth knowing.
Upfront carbon A0 to A5
Everything up to handover: making the materials, getting them to site and building. It has all been emitted before anyone moves in.
Embodied carbon A, B1 to B5 and C
Upfront carbon plus maintenance, replacements and refurbishment, and the end of life. Everything except running the building.
Operational carbon B6 and B7
The energy and water used to run the building. Part L of the Building Regulations only covers the regulated part of the energy, at design stage.
Whole life carbon A to C
Embodied plus operational. Module D is reported alongside it but never taken off the total.
The earlier, the bigger the saving
At Stage 0 you can still decide to keep the existing building. By the time it's on site, the big decisions are fixed, and what's left is buying and building well.
Cut it in this order
PAS 2080, the British standard for managing carbon on projects, ranks the options. Start at the top.
Avoid
Question whether you need to build new at all. Keep and reuse what's there, or build less.
Switch
Change to lower carbon materials, products and technologies, such as concrete with less cement or steel with more recycled content.
Improve
Use less of whatever you do build: an efficient structure, less waste on site, products that last longer.
Who asks for it and what they want
Who asks for whole life carbon at the top. What they measure against, and the methods and data underneath, below. Open any item for the detail.
- Law
- Planning
- Client
- Voluntary
- Draft
- Proposal
Who asks for it
The requirement comes from planning, the law, the client or a scheme the client signs up to.
Planning
GLA whole life-cycle carbon assessmentLondon Plan 2021, Policy SI 2Planning
- What
An assessment on the GLA template for every planning application referable to the Mayor: outline, detailed or hybrid. The GLA encourages one on other major schemes but doesn't require it.
- When
Pre-application where relevant, at planning submission (RIBA Stage 2 or 3) and post-construction.
- How
BS EN 15978 and the RICS PS, with the GLA's Box 1 differences: all modules A to D, GLA carbon factors, CIBSE TM54 for non-residential operational energy, pre-construction demolition included, and TM65 for MEP at post-construction. Results are compared with the GLA benchmarks.
- Watch
The guidance dates from March 2022 and was written for the 2017 RICS PS. Use the 2nd edition with the Box 1 differences, and check the template version before each submission.
GLA Circular Economy StatementLondon Plan 2021, Policy SI 7Planning
- What
How a referable scheme keeps materials in use: pre-redevelopment and pre-demolition audits, circular design principles, a bill of materials, waste reporting and a post-completion report.
- Targets
95% of construction and demolition waste diverted from landfill, and 95% of excavation waste put to beneficial use.
- Watch
The pre-redevelopment audit is where the case to keep or demolish existing buildings is made, so do it before the massing is fixed. The GLA says modules C3 and D of the assessment should be informed by the statement.
London boroughsWestminster, City of London, CamdenPlanning
- Westminster
Policy 43 Retrofit first, adopted 21 January 2026: all reasonable retrofit options must be explored before demolition is proposed.
- City of London
The Planning for Sustainability SPD (February 2025) expects a whole life carbon assessment and carbon optioneering. Its 2023 optioneering advice note covers majors over 1,000 m² and schemes demolishing most of a structure. City Plan 2040, which moves the City to retrofit first, was delayed by a ministerial direction in June 2026.
- Camden
A new Local Plan that prioritises keeping existing buildings was at examination in 2026. Check whether it's been adopted.
- Watch
Adopted plan policy carries full weight. SPDs and advice notes are material considerations. Read the current documents at the start of every project.
Councils outside Londonfor example Bath & North East SomersetPlanning
- What
Councils can set their own carbon policies. Bath & North East Somerset's Policy SCR8 (2023) asks large-scale new development, 50 or more homes or 5,000 m² of commercial space, to show it can achieve 900 kgCO₂e/m² or less for the substructure, superstructure and finishes.
- National policy
The revised NPPF (17 August 2026) supports reusing existing structures and materials, and lets local plans set energy efficiency standards above the Building Regulations if the cost case is robust. Bioregional reads it as leaving room for local embodied carbon standards. That's their reading, not the policy text.
- Watch
Local policies change faster than national rules. Check the adopted plan, SPDs and advice notes for every site.
Draft London Plan 2026draft, expected March 2028Draft
- Status
Published 16 July 2026, consultation closed 15 October. The GLA's timetable has the examination in autumn or winter 2027 and publication in March 2028. The London Plan 2021 applies until then.
- Carbon
Policy GHR3: referable schemes assess keeping existing buildings, meet baseline upfront carbon targets, aim for aspirational ones, and report through the GLA tool. The figures are under What sets the number.
- Energy and waste
GHR1 sets energy use and space heating targets for major developments, with five years of in-use reporting, and drops carbon offsetting. GLE11 keeps the Circular Economy Statement and adds a target of 20% reused or recycled content by value.
- Watch
A scheme in early design now could be decided under the new Plan, so test it against the baselines. Some consultation responses, Max Fordham's among them, question the evidence for the targets, so the figures may change.
National law
Part LBuilding Regulations, operational energy onlyLaw
- What
The only national legal carbon requirement for new buildings in England. It covers regulated operational energy at design stage and nothing on embodied carbon.
- Next
The Future Homes Standard was published on 24 March 2026 and comes into force on 24 March 2027, with a 12-month transition.
- Embodied carbon
In March 2026 the government rejected a Commons committee recommendation to make whole life carbon assessments mandatory. In July the housing minister said it is "taking time to consider the right approach" and has commissioned research on embodied carbon data.
Part Zindustry proposal, not lawProposal
- What
An industry proposal to add whole life carbon to the Building Regulations: reporting first, on buildings over 1,000 m² GIA or more than 10 homes, then legal limits on upfront carbon.
- Status
Not adopted. In July 2026 the minister called it "one possible approach". The government's carbon budget plan says it will promote whole life carbon assessments, with adoption encouraged from the fifth carbon budget, 2028 to 2032.
- Watch
If something like it arrives, I'd expect reporting to the RICS PS to be the basis. Clients already reporting that way will be ready.
Green claims lawCMA powers since April 2025Law
- What
Since 6 April 2025 the CMA can fine businesses up to 10% of global turnover for misleading environmental claims to consumers, so "net zero building" or "low carbon" needs evidence behind it. Whether it reaches business-to-business marketing isn't confirmed here.
- Watch
Agree claim wording with the client's marketing team at the start, in writing. NZCBS has its own wording rules.
UK carbon border adjustmentfrom 1 January 2027Law
- What
A carbon price on the embodied emissions of imported aluminium, cement, iron and steel, fertiliser and hydrogen, from 1 January 2027.
- Why it matters
It isn't a building requirement, but it puts a price on the embodied carbon in imported structural materials. I'd expect it to show up in supplier prices. That's my expectation, not something the rules say.
Waste lawduty of care, waste hierarchyLaw
- What
Anyone producing construction waste has to apply the waste hierarchy and meet the duty of care when waste leaves site (Waste (England and Wales) Regulations 2011; Environmental Protection Act 1990, section 34).
- Watch
Site Waste Management Plans haven't been a legal requirement in England since 2013, but clients and schemes still ask for them.
Clients and funders
NHS Net Zero Building StandardNHS projectsClient
- What
For NHS projects that need Treasury business case approval: a whole life carbon assessment at each design stage, to RICS guidance and BS EN 15978.
- Limit
An upfront carbon limit set at the start of RIBA Stage 2, for Tier 1 elements only: substructure, superstructure and facades. Retrofit projects have to show a whole life carbon benefit.
- Watch
Because it covers Tier 1 only, the limit can't be compared with an NZCBS or LETI figure.
Central governmentNISTA handbook, March 2026Client
- What
NISTA's Whole Life Carbon Management Handbook tells government asset owners and arm's-length bodies to build whole life carbon into decisions using PAS 2080: assessments, mitigation and targets in tCO₂e at each business case stage, and as-built data shared, for example through BECD.
- Watch
It's guidance, applied through business cases and contracts. Public clients want a carbon management process as well as the numbers.
PPN 006 Carbon Reduction Plansthe contractor's own emissionsClient
- What
Bidders for central government contracts worth over £5m a year publish a Carbon Reduction Plan: a commitment to net zero by 2050, with Scope 1, Scope 2 and some Scope 3 emissions. It applies to procurements from 24 February 2025.
- Watch
It covers the company's emissions, not the carbon of the buildings it delivers.
Investors and lendersScope 3, GRESB, CRREM, PCAFClient
- What
Many client carbon targets are company targets. A building's embodied carbon usually sits in the owner's or developer's Scope 3, and Appendix A of the RICS PS maps assessment results to GRESB, CRREM and PCAF.
- Watch
"Net zero by 2040" is a company target, not a building one. Confirm which the client means before scoping.
Certification and claims
BREEAM V7Mat 01 life cycle assessmentVoluntary
- What
LCA credits at early design, technical design and post-construction, plus benchmark credits. An LCA at one stage is a minimum standard for Excellent, and all three for Outstanding, in New Construction V7.1, Refurbishment V7 and Fit Out V7.
- When
On New Construction and Refurbishment the early design LCA has to be uploaded within 20 working days of the planning submission.
- How
Elements follow the RICS PS 2nd edition. Report A1-A5, B1-B5 and C1-C4, and D unless EN 15804+A2 data isn't available (BRE GN51).
LEED v5MRp2 embodied carbonVoluntary
- What
A prerequisite: record quantities of key materials, report their A1-A3 global warming potential from EPDs, and summarise the three biggest sources with reduction strategies. No reduction is required.
- Watch
It covers A1-A3 of selected materials only, so it can't be compared with a full assessment.
UK Net Zero Carbon Buildings StandardV1 Rev 1, verification openVoluntary
- What
The UK's cross-industry definition of a Net Zero Carbon Aligned Building. It limits upfront carbon and measured energy use, bans fossil fuels on site, caps refrigerant GWP at 677 and sets on-site renewables targets. Buildings are verified in use, not at design.
- When
Register at design and declare the start year. Verification comes after 12 months of operation at 80% occupancy or more. It opened on 28 July 2026, with Bureau Veritas as administrator and, for now, the only verifier.
- Cost
£500 registration per building, plus an administration fee of £1,190 to £6,580 depending on floor area and route, excluding VAT. The verifier quotes separately.
- Watch
Until verification the only permitted wording is "targeting verification to the UK Net Zero Carbon Buildings Standard". Version 1 Rev 1 was still the current version on 13 November 2026.
What sets the number
Limits have to be met. Benchmarks are compared and explained. Targets are voluntary.
Limits
NZCBS upfront carbon limitsAnnex A, by sector, works type and start yearVoluntary
- Example
Offices, new works, in kgCO₂e/m² GIA: 765 for a 2026 start, 725 for 2027 and 685 for 2028 (Annex A, Table EC-1). Read the current table every time, never a figure from memory.
- Scope
Modules A0-A5 across all RICS PS element categories, fit-out included. External works, pre-construction demolition, on-site renewables, most loose FF&E (it counts for offices) and sequestered biogenic carbon are left out.
- Watch
On an office, a start that slips a year costs about 40 kgCO₂e/m² of headroom. Declaring the start year at registration keeps the earlier limit if the delay is up to a year, outside the client's control and evidenced.
Draft London Plan targetsGHR3 upfront carbon, GHR1 energyDraft
- Upfront carbon, kgCO₂e/m²
Building type Baseline Aspirational Residential under 11 m 500 400 Residential 11 m and over 700 565 Use Class E 700 605 - Energy use, kWh/m²/yr GIA
Space heating demand 20 baseline and 15 aspirational for all building types, plus these energy use intensity targets:
Building type Baseline Aspirational Residential 40 35 Office 90 70 Primary school 40 35 Industrial 40 35 Hotel 120 80 Student accommodation 65 50 - Watch
The modules and elements the upfront targets cover will be set in new GLA guidance. Check them before comparing a project figure.
Benchmarks
GLA WLC benchmarkscompare and explainPlanning
- What
Benchmarks and aspirational benchmarks by building type, in Appendix 2 of the GLA guidance. Referable schemes compare their results and explain any outside the range. They aren't pass or fail.
- Watch
They reflect 2022 data. Draft Policy GHR3 adds upfront carbon targets on top.
BREEAM V7 carbon benchmarkMat 01 benchmark creditsVoluntary
- What
Up to two credits and an exemplary credit for performance against BRE's embodied carbon benchmark, in bands A to G, with the values held on the BREEAM Platform. Covers A1-A5, B1-B5 and C1-C4.
- Applies to
New Construction for the building types BRE lists (not shell only), and Refurbishment when Parts 1 to 3 or all four are assessed. Fit Out has no benchmark credit.
Voluntary targets
LETI bandsA++ to GVoluntary
- What
Embodied Carbon Target Alignment (October 2022), produced with RIBA, the GLA, IStructE and UKGBC. Bands for upfront carbon (A1-A5, sequestration excluded) and life cycle embodied carbon (A1-A5, B1-B5, C1-C4, sequestration included).
- Reading it
Average design is about band E and good design about C. The LETI 2030 target is about A, and the RIBA 2030 built target about B.
- Watch
LETI's website says it's "currently hibernating", but the bands are still widely used. Always give the scope with the band, for example "band B, upfront (A1-A5)".
RIBA 2030 Climate Challengepractice targetsVoluntary
- What
Voluntary targets for operational energy, embodied carbon, potable water and health. The 2021 embodied carbon figures were aligned with LETI.
- Watch
RIBA's dates are completion years and LETI's are design years. When an architect quotes "the RIBA target", check which year and scope.
IStructE SCORSstructural carbon ratingVoluntary
- What
An A++ to G rating for the upfront carbon of the substructure and superstructure. Structure is typically 50 to 60% of a building's upfront carbon, and LETI band A typically lines up with SCORS B for offices, residential and education buildings.
UKGBC Whole Life Carbon FrameworkMay 2026Voluntary
- What
Principles and actions for cutting whole life carbon and dealing with what's left, for projects and organisations. It replaces UKGBC's 2019 net zero framework definition, which UKGBC says is no longer in use.
- Watch
Calling a building "Net Zero Carbon Aligned" needs NZCBS verification. Briefs that still cite the 2019 framework need updating.
How it's calculated
One method sits under almost everything above.
Method and process
RICS WLCA Professional Standard2nd edition, in effect since 1 July 2024
- What
The UK standard for calculating and reporting whole life carbon: modules A0-A5, B1-B7 (B8 optional) and C1-C4, with D reported separately; ICMS 3 element categories; a 60-year study period for buildings; UK default data and reporting templates.
- Used by
The GLA, NZCBS, BREEAM V7, LETI, the NHS, NISTA and PAS 2080. The assessor doesn't have to be an RICS member.
- Biogenic carbon
Sequestered carbon is kept out of upfront carbon and reported separately. It's included in embodied and whole life totals, where the end-of-life emissions largely cancel it out.
- Watch
If a client or council wants a different method, the report has to say which and why. No newer edition turned up in a check on 13 November 2026.
EN 159782011 and 2026 editions
- What
The European calculation method for buildings, which set the A to D life cycle modules. EN 15978:2026 replaces the 2011 edition, and BS EN 15978:2026 is listed as published on 31 July 2026. EN 17472 is the civil engineering counterpart.
- Watch
The GLA still cites the 2011 edition. State the edition used in every report.
PAS 2080:2023carbon management process
- What
How everyone in the value chain manages carbon: leadership, baselines, targets, the Avoid, Switch, Improve hierarchy, procurement and monitoring. It covers buildings as well as infrastructure.
- Watch
It isn't a calculation method. On buildings it earns its keep on governance, targets and procurement, and it's the basis of NISTA's guidance.
Specialist guides
TM65, TM54, IStructE, CWCTfor the parts the RICS PS refers out
- What
CIBSE TM65 for MEP products without EPDs, CIBSE TM54 for operational energy prediction, IStructE's How to calculate embodied carbon for structures, and the CWCT method for facades.
- Required by
GLA: TM65 for MEP at post-construction and TM54 for non-residential operational energy. NZCBS: TM65 or CWCT where there is no EPD, IStructE v3 defaults for its generic specification comparison, and TM54 for PC On Track. NHS: TM65.
- Watch
MEP is the usual gap in as-built assessments: ductwork, cable trays, fan coil units and light fittings.
Future Homes Hub conventionsWhole Life Carbon Conventions for New Homes
- What
A shared, voluntary approach to whole life carbon for housebuilders, with an assessment tool. The July 2026 update adds roads, utilities and other works beyond the plot boundary.
What it runs on
Product data, tools and databases.
Data and tools
EPDsEN 15804+A2, ISO 21930
- What
Environmental Product Declarations: verified product LCA data under ISO 14025. Product-specific data beats sector average, and sector average beats generic.
- Watch
The NZCBS treats generic data as an error where a manufacturer's EPD exists. Ask for EPDs in the tender documents, not after handover.
LCA tools and generic datafor example One Click LCA
- What
Software that applies the method to quantities from a cost plan, bill of quantities or BIM model, using generic databases until the products are known.
- Watch
The assessor has to check the tool complies with the RICS PS, and two tools can give different answers for the same building. Record the tool, database version and assumptions in every report.
Built Environment Carbon DatabaseBECD
- What
A free cross-industry database founded by RICS with partners: project assessments plus more than 35,000 products, used to build UK benchmarks.
- Watch
The GLA encourages submissions and NISTA asks for as-built data to be shared. Benchmarks are only as good as what's uploaded.
Underlying standardsISO 14040/44, ISO 14064, ISO 59000
- What
ISO 14040 and 14044 set the LCA principles, and ISO 14067 covers product carbon footprints, which the NZCBS accepts where there is no EPD. The GHG Protocol and ISO 14064 are for company Scope 1 to 3 accounting. BS 8001 and the ISO 59000 series are voluntary circular economy frameworks.
What applies to your project
Find the rows that match the site and the client. Most projects match more than one, and each brings its own deadlines. The boxes show the RIBA stages where something is due.
| If the project is | Assessment | A number to hit | When |
|---|---|---|---|
| London, referable to the MayorTypically more than 150 homes, tall buildings or large floor areas | Yes. A WLCA on the GLA template, plus a Circular Economy Statement. | No limit yet. Compare with the GLA benchmarks and explain. Draft London Plan targets from 2028. | 01234567Audit early, pre-app, planning, post-construction |
| London, not referableCheck the borough | Depends on the borough. The City of London expects one, and Westminster's Retrofit first policy needs retrofit options tested before demolition. | Not usually. | 01234567With the planning application |
| Outside LondonCheck the local plan | Only where the local plan asks, for example large schemes in Bath & North East Somerset. | B&NES: 900 kgCO₂e/m² for substructure, superstructure and finishes. | 01234567With the planning application |
| Client wants BREEAM V7New Construction, Refurbishment or Fit Out | LCAs at early design, technical design and post-construction. One is a minimum for Excellent, all three for Outstanding. | Benchmark credits, not a limit. | 01234567Early LCA within 20 working days of the planning submission (New Construction and Refurbishment) |
| Client wants a net zero carbon claimUK NZCBS | An as-built WLCA to the NZCBS scope, plus 12 months of measured energy data. | Yes: the Annex A upfront carbon limit, an energy use limit and more. | 01234567Register at design, verify after 12 months at 80% occupancy |
| NHS projectNeeding Treasury business case approval | Yes, at every design stage. | An upfront limit for substructure, superstructure and facades, set at the start of Stage 2. | 01234567Each design stage, then handover |
| Central government clientDepartments and arm's-length bodies | Expected at each business case stage (NISTA handbook). | Project targets in tCO₂e. No national figure. | Each business case stage |
| Investor or lender asksESG and Scope 3 reporting | Often asked for as data for GRESB, CRREM or PCAF reporting. | Usually a company target, not a building one. | As agreed with the client |
How I'd approach it
Find the trigger
Check whether the scheme is referable, read the council's adopted plan and SPDs, and ask the client what they've promised a certifier, a funder or their own board.
Assess once, report many times
Build one assessment to the full RICS PS scope and report the slice each scheme wants. Never reuse a figure from one scheme in another without checking its scope.
Write data into the contract
EPDs, as-built quantities and delivery records have to be asked for in the tender, or they won't exist at handover.
Test against what is coming
A London scheme in early design now could be decided after March 2028. Check it against the draft London Plan baselines while the design can still change.
Why the numbers don't compare
Each scheme counts different life cycle modules and building elements, so a LETI band, a GLA benchmark and an NZCBS limit can't be lined up against each other. Build one assessment to the full RICS PS scope and report the slice each scheme asks for.
- included in the figure
- partly included
- reported separately
- blank: not covered
| Scheme | MaterialsA1-A3 | TransportA4 | Building itA5 | UpkeepB1-B5 | RunningB6-B7 | End of lifeC1-C4 | BeyondD | What it counts |
|---|---|---|---|---|---|---|---|---|
| RICS PS, full assessment | A1-A3: included | A4: included | A5: included | B1-B5: included | B6-B7: included | C1-C4: included | D: reported separately | All element categories, including fit-out, external works and demolition (A5.1). 60-year study period. Sequestered carbon is reported separately from upfront carbon. |
| GLA WLCA | A1-A3: included | A4: included | A5: included | B1-B5: included | B6-B7: included | C1-C4: included | D: reported separately | All building elements, with Cat B left out for shell and core. Pre-construction demolition has to be reported. |
| NZCBS upfront limit | A1-A3: included | A4: included | A5: partly included | B1-B5: reported separately | B6-B7: reported separately | C1-C4: reported separately | D: reported separately | Fit-out included. External works, A5.1 demolition, on-site renewables and most loose FF&E left out. B and C are reported, not limited, and energy has its own limit. |
| LETI upfront band | A1-A3: included | A4: included | A5: included | B1-B5: not covered | B6-B7: not covered | C1-C4: not covered | D: reported separately | At least 95% of cost. Non-fixed FF&E, external works and PV left out. Sequestration excluded. |
| LETI life cycle band | A1-A3: included | A4: included | A5: included | B1-B5: included | B6-B7: not covered | C1-C4: included | D: reported separately | Same elements as the upfront band. Sequestration included. |
| BREEAM V7 Mat 01 | A1-A3: included | A4: included | A5: included | B1-B5: included | B6-B7: not covered | C1-C4: included | D: reported separately | Elements per BRE GN51. D unless EN 15804+A2 data isn't available. Operational energy sits in other issues. |
| NHS upfront limit | A1-A3: included | A4: included | A5: included | B1-B5: not covered | B6-B7: not covered | C1-C4: not covered | D: not covered | Tier 1 elements only: substructure, superstructure and facades. |
| IStructE SCORS | A1-A3: included | A4: included | A5: included | B1-B5: not covered | B6-B7: not covered | C1-C4: not covered | D: not covered | Substructure and superstructure only. |
| LEED v5 MRp2 | A1-A3: included | A4: not covered | A5: not covered | B1-B5: not covered | B6-B7: not covered | C1-C4: not covered | D: not covered | Key materials only: structure, enclosure and hardscape. |
| Building Regulations Part L | A1-A3: not covered | A4: not covered | A5: not covered | B1-B5: not covered | B6-B7: partly included | C1-C4: not covered | D: not covered | Regulated operational energy only, calculated at design stage. |
A0 is usually zero for buildings, and B8 (user activities) is optional in the RICS PS, so neither is shown.
Jargon buster
104 terms and abbreviations from this page, in plain English. Open a group to read it. On a computer, hover over any term with a dotted underline for a quick reminder.
The basicsCarbon, CO₂e, GHG, GWP, kgCO₂e/m², tCO₂e, and more17
- Carbon
- Shorthand for all greenhouse gases, not just carbon dioxide.
- CO₂e
- Carbon dioxide equivalent. Every greenhouse gas converted into the amount of CO₂ that would warm the planet as much, so they can be added together.
- GHG
- Greenhouse gas.
- GWP
- Global warming potential. How strongly a gas warms the planet compared with CO₂. Assessment results are reported as GWP, in kgCO₂e.
- kgCO₂e/m²
- Kilograms of CO₂e per square metre of floor area, usually GIA. The normal way to compare buildings of different sizes.
- tCO₂e
- Tonnes of CO₂e. Used for whole projects and company totals.
- WLC
- Whole life carbon: embodied plus operational carbon over the whole life of the building, modules A to C.
- Upfront carbon
- Modules A0 to A5. Everything up to handover, from making the materials to finishing the build.
- Embodied carbon
- Modules A, B1 to B5 and C. The materials and works over the whole life, but not the energy and water used to run the building.
- Operational carbon
- Modules B6 and B7. The energy and water used to run the building.
- Sequestered (biogenic) carbon
- CO₂ taken in by trees and plants as they grow and stored in timber and other bio-based materials. The RICS PS keeps it out of upfront carbon and reports it separately.
- Reference study period
- How long an assessment assumes the building is in use: 60 years for buildings under the RICS PS.
- Baseline
- What a project's carbon would have been without any measures to reduce it. Savings are measured against it.
- Limit, target and benchmark
- A limit is a number you must stay under. A target is one you aim for. A benchmark is a typical figure to compare with.
- Net zero carbon building
- Under the UK NZCBS, a building that meets the Standard's limits on upfront carbon and energy use, among others, uses no fossil fuels on site (with listed exceptions) and is checked against measured data.
- Scope 1, 2 and 3
- Company carbon accounting. Scope 1 is a company's own fuel and vehicles, Scope 2 the electricity and heat it buys, and Scope 3 everything else in its supply chain, including the embodied carbon of buildings it builds or buys.
- ESG
- Environmental, social and governance. How investors judge a company or fund beyond its finances.
Life cycle stagesModules, A0, A1-A3, A4, A5, B1, and more12
- Modules
- The stages a building's life is split into, coded A to D. Set out in BS EN 15978 and the RICS PS.
- A0
- Activities before construction starts, such as surveys and studies. Usually tiny, and taken as zero in the NZCBS.
- A1-A3
- The product stage: getting the raw materials (A1), taking them to the factory (A2) and manufacturing (A3). Usually the biggest part of upfront carbon.
- A4
- Transporting materials and products to site.
- A5
- Construction and installation on site, including site energy and waste. A5.1 is demolishing and clearing what was there before.
- B1
- Emissions from the building in use, such as refrigerant leaks.
- B2 to B5
- Maintenance (B2), repair (B3), replacement (B4) and refurbishment (B5) over the study period.
- B6
- All the energy used in the building: heating, cooling, hot water, lighting, lifts and plug-in equipment.
- B7
- The water used in the building, and the carbon of supplying and treating it.
- B8
- User activities that have nothing to do with running the building. Optional in the RICS PS.
- C1 to C4
- End of life: demolition (C1), taking the waste away (C2), processing it for reuse or recycling (C3) and disposal, such as landfill (C4).
- D
- Benefits and loads beyond the building's life, such as the carbon saved when its materials are reused or recycled. Reported separately and never taken off the total.
Methods and dataWLCA, LCA, RICS PS, BS EN 15978, EPD, EN 15804+A2, and more16
- WLCA
- Whole life carbon assessment. The calculation of a building's whole life carbon, usually to the RICS PS.
- LCA
- Life cycle assessment. The general method behind a WLCA. It can cover other environmental impacts too, but here it means carbon. BREEAM uses this term.
- RICS PS
- The RICS Professional Standard, Whole life carbon assessment for the built environment, 2nd edition. The UK rulebook for doing a WLCA, in effect since 1 July 2024.
- BS EN 15978
- The European standard for assessing the environmental performance of buildings, which the RICS PS builds on. EN means a European standard and BS its British edition.
- EPD
- Environmental Product Declaration. An independently checked report of a product's environmental impacts, including its carbon, made to EN 15804 or ISO 21930.
- EN 15804+A2
- The European standard for construction product EPDs. +A2 is its 2019 amendment, which changed how carbon is reported. Older EPDs may not follow it.
- Generic data
- Average carbon figures for a type of material, used until the actual products are chosen.
- ISO
- International Organization for Standardization. ISO 14040 and 14044 set out how to do an LCA, ISO 14064 covers greenhouse gas accounting, ISO 21930 product EPDs and ISO 59000 the circular economy.
- PAS 2080
- A BSI specification for managing carbon on building and infrastructure projects. A process, not a calculation method. PAS stands for Publicly Available Specification.
- TM65 and TM54
- CIBSE technical memoranda. TM65 estimates the embodied carbon of building services equipment when there's no EPD. TM54 predicts operational energy use at design stage.
- BECD
- Built Environment Carbon Database. A shared UK database of assessment results, to give the industry reliable benchmarks.
- BIM
- Building information modelling. A 3D digital model of the building with data attached, which can feed quantities into an assessment.
- ICMS 3
- International Cost Management Standard, 3rd edition. The RICS PS uses its list of building elements, so carbon and cost can be reported the same way.
- GN51
- BRE's guidance note on LCA and embodied carbon for Mat 01 in BREEAM V7.
- GHG Protocol
- The main standard for company carbon accounting. It defines Scopes 1, 2 and 3.
- Carbon Reduction Plan
- A supplier's published commitment to net zero by 2050, with its current emissions. Needed for some central government contracts under PPN 006.
Who's whoGLA, RICS, RIBA, CIBSE, IStructE, CWCT, and more15
- GLA
- Greater London Authority: the Mayor of London and the London Assembly. Writes the London Plan and reviews the largest planning applications.
- RICS
- Royal Institution of Chartered Surveyors. Publishes the RICS PS.
- RIBA
- Royal Institute of British Architects. Publishes the Plan of Work stages and the 2030 Climate Challenge.
- CIBSE
- Chartered Institution of Building Services Engineers. Publishes TM65 and TM54.
- IStructE
- Institution of Structural Engineers. Publishes guidance on structural embodied carbon, and SCORS.
- CWCT
- Centre for Window and Cladding Technology. Publishes the method for working out facade embodied carbon.
- BRE
- Building Research Establishment. Owns and runs BREEAM.
- BSI
- British Standards Institution. The UK standards body, which publishes PAS 2080 and the British editions of European standards.
- UKGBC
- UK Green Building Council. An industry charity whose Whole Life Carbon Framework and explainers are widely used.
- LETI
- A volunteer network of built environment professionals that began as the London Energy Transformation Initiative. Publishes the A++ to G embodied carbon bands.
- NISTA
- National Infrastructure and Service Transformation Authority. The government body for major projects, which published the 2026 Whole Life Carbon Management Handbook.
- NHS
- National Health Service. Its Net Zero Building Standard sets the carbon rules for NHS projects.
- CMA
- Competition and Markets Authority. Since April 2025 it can fine businesses directly for misleading claims, green claims included.
- BCIS
- Building Cost Information Service. A provider of construction cost and carbon data.
- B&NES
- Bath & North East Somerset Council.
Schemes and investorsBREEAM, Mat 01, LEED, NZCBS, SCORS, RIBA 2030 Climate Challenge, and more10
- BREEAM
- BRE's sustainability rating for buildings, from Pass to Outstanding. V7 is the current version. RFO 2014 is the older Refurbishment and Fit-out scheme.
- Mat 01
- The BREEAM V7 issue that covers LCA and embodied carbon.
- LEED
- The US Green Building Council's rating system, used on some UK projects. v5 is the latest version, and MRp2 its prerequisite on measuring embodied carbon.
- NZCBS
- UK Net Zero Carbon Buildings Standard. The cross-industry standard for showing a building is net zero carbon. V1 Rev 1 is the current version, and Annex A holds its limits.
- SCORS
- Structural Carbon Rating Scheme. IStructE's A++ to G rating for the embodied carbon of a structure.
- RIBA 2030 Climate Challenge
- Voluntary carbon, energy and water targets for architects to design to.
- GRESB
- A global ESG benchmark that property funds and companies report to each year.
- CRREM
- Carbon Risk Real Estate Monitor. Pathways for how fast a property's emissions need to fall, which investors use to spot buildings at risk of losing value.
- PCAF
- Partnership for Carbon Accounting Financials. How banks and investors measure the emissions of the loans and investments they hold.
- PPN 006
- Procurement Policy Note 006. Central government's rule that bidders for larger contracts publish a Carbon Reduction Plan.
Planning and rulesLondon Plan, Referable scheme, Circular Economy Statement, Draft London Plan 2026, Local plan, SPD, and more12
- London Plan
- The Mayor's planning strategy for London. Policy SI 2 asks for the whole life carbon assessment and SI 7 for the Circular Economy Statement.
- Referable scheme
- A planning application big enough that the borough has to refer it to the Mayor, for example 150 or more homes or a tall building. The thresholds are set in law.
- Circular Economy Statement
- A report on how a London scheme will keep materials in use and cut waste, from demolition to the end of the new building's life.
- Draft London Plan 2026
- The proposed new London Plan, expected in March 2028. GHR1 is its energy policy, GHR3 upfront carbon and GLE11 the circular economy.
- Local plan
- A council's own planning policies. Some add carbon rules, such as B&NES Policy SCR8.
- SPD
- Supplementary Planning Document. Council guidance on how its local plan policies work in practice.
- NPPF
- National Planning Policy Framework. The government's planning policy for England, which local plans have to follow.
- Pre-app
- Pre-application advice: talks with the council before a planning application goes in.
- Part L
- The part of the Building Regulations on energy efficiency. It covers operational energy only.
- Part Z
- An industry proposal for a new part of the Building Regulations on whole life carbon. Not law.
- Carbon border adjustment
- A UK charge from 1 January 2027 on the carbon in some imports, including steel, aluminium and cement.
- Retrofit first
- Westminster's policy that retrofit options are tested before demolition is accepted.
Building termsGIA, Substructure, Superstructure, Facade, MEP, FF&E, and more13
- GIA
- Gross internal area. Floor area measured to the inside face of the external walls. The usual divisor in kgCO₂e/m².
- Substructure
- Everything below the ground floor: foundations, basements and the ground slab.
- Superstructure
- The building above the foundations: frame, upper floors, roof, stairs, walls, windows and doors. Some schemes count the facade separately.
- Facade
- The outside skin of the building: external walls, cladding and windows.
- MEP
- Mechanical, electrical and plumbing: heating, cooling, ventilation, power, lighting, water and lifts. Also called building services.
- FF&E
- Furniture, fixtures and equipment. Loose FF&E is anything not fixed to the building.
- Shell and core
- A building handed over with its structure, outer skin, cores and shared areas finished, but the tenant floors left for fit-out.
- Cat A and Cat B
- Office fit-out levels. Cat A is a finished but empty floor: ceilings, raised floors, lighting and air conditioning. Cat B is the tenant's own fit-out: partitions, kitchens and furniture.
- Use Class E
- The planning use class for commercial, business and service uses, such as shops, offices, cafes and gyms.
- External works
- Everything on the site outside the building: landscaping, paving, drainage and boundaries.
- PV
- Photovoltaic (solar electric) panels.
- kWh/m²/yr
- Kilowatt hours of energy per square metre of floor area per year. How energy use is compared between buildings.
- Retrofit
- Upgrading an existing building instead of replacing it.
RIBA stagesWhat stages 0 to 7 mean, from Strategic Definition to Use9
- RIBA stages
- The eight stages of the RIBA Plan of Work 2020, used across the industry to say how far a project has got.
- 0 Strategic Definition
- Deciding what the client needs, and whether a new building is the answer at all.
- 1 Preparation and Briefing
- Writing the brief, studying the site and setting the targets.
- 2 Concept Design
- The overall design idea, form and massing. London planning applications often go in here or at Stage 3.
- 3 Spatial Coordination
- The design coordinated between architect, engineers and services designers.
- 4 Technical Design
- Detailed design and specifications, ready to build.
- 5 Manufacturing and Construction
- Building it on site and off site.
- 6 Handover
- Completion, handover and the post-construction assessment.
- 7 Use
- The building in operation, when measured energy and water data comes in.
What's changed, and what's coming
Since March 2026
- 13 Mar 2026The government rejects a Commons committee call for mandatory whole life carbon assessments.
- 24 Mar 2026Future Homes Standard published. It covers operational energy only.
- 13 Jul 2026The housing minister says the government is "taking time to consider the right approach" on embodied carbon.
- 16 Jul 2026Draft London Plan published, with upfront carbon targets. Consultation closed on 15 October. Draft
- 28 Jul 2026NZCBS verification opens, with Bureau Veritas as administrator.
- 31 Jul 2026BS EN 15978:2026 published, replacing the 2011 edition.
- 17 Aug 2026Revised NPPF supports reusing existing structures and materials.
- Aug to Sep 2026BREEAM V7.1 becomes the New Construction version. Refurbishment V7 and Fit Out V7 launch.
Coming up
- 1 Jan 2027UK carbon border adjustment puts a carbon price on imported steel, aluminium and cement.
- 27 Jan 2027BREEAM RFO 2014 closes to new registrations.
- 24 Mar 2027Future Homes Standard comes into force.
- 2027NZCBS opens to verifiers from other organisations.
- Late 2027Draft London Plan examination, autumn or winter (GLA timetable). Draft
- Mar 2028New London Plan expected to be published, with its upfront carbon targets. Draft
- 2028 to 2032The government says it will encourage whole life carbon assessments from the fifth carbon budget.
- 2028 and 2030Life-cycle GWP disclosure for new buildings over 1,000 m², then all new buildings. EU only
Sources and checks
Facts come from the documents below or from web sources checked on the dates shown. Where a line is my reading rather than what a source says, the page says so.
Read directly
- RICS, Whole life carbon assessment for the built environment, 2nd edition, version 3 (Aug 2024)
- UK Net Zero Carbon Buildings Standard V1 Rev 1 (Apr 2026); Verification Process for Claimants Rev 1 and Fee Sheet Rev 1 (Jul 2026)
- GLA, London Plan Guidance: Whole Life-Cycle Carbon Assessments (Mar 2022)
- BREEAM UK New Construction V7.1 (SD6074), Refurbishment V7 (SD6075) and Fit Out V7 (SD6076) technical manuals
- BSI, PAS 2080:2023
- LETI, Embodied Carbon Target Alignment (Oct 2022)
Checked online, 23 Nov 2026 (the basics)
- UKGBC, Whole life carbon explainer (Feb 2023)
- BCIS, The basics of carbon in construction (Mar 2025)
- NISTA, Whole Life Carbon Management Handbook (Mar 2026)
Checked online, 13 Nov 2026
- CIBSE, response to the government position on whole life carbon assessments (23 Mar 2026)
- Local Government Lawyer, government response to the Environmental Audit Committee (13 Mar 2026)
- Westminster Brief, Commons debate on embodied carbon in buildings (13 Jul 2026)
- MODBS, BCIS on the Carbon Budget and Growth Delivery Plan (13 Jan 2026)
- TCPA, Climate Guide: net zero buildings and embodied carbon (Dec 2025)
- City of London, response to the government direction on City Plan 2040 (29 Jun 2026)
- Thornton Tomasetti, the City of London Planning for Sustainability SPD (28 Jan 2026)
- Montagu Evans, Central London planning policy update, Q4 2025 to Q1 2026
- RIBA Journal, the new NPPF: what architects need to know (25 Aug 2026)
- Freeths, Environmental Law Update, UK carbon border adjustment (2026)
- Specification Online, Future Homes Hub Whole Life Carbon Conventions (24 Jul 2026)
- NZCBS, The Standard (current version)
Checked online, 25 Oct to 10 Nov 2026
- GLA, Draft London Plan 2026, Chapter 5 (GHR1, GHR3)
- GLA, Draft London Plan 2026, Chapter 4 (GLE11)
- GLA, MD3515 London Plan timetable
- Max Fordham, response to the Draft London Plan 2026 (Oct 2026)
- Westminster City Council, adoption of the City Plan Partial Review (Jan 2026)
- City of London, WLC optioneering advice note (Mar 2023)
- Bioregional, NPPF 2026 and local standards
- Elmhurst Energy, the Future Homes Standard (Mar 2026)
- NHS Net Zero Building Standard (Feb 2023)
- NISTA, Whole Life Carbon Management Handbook (Mar 2026)
- PPN 006, Taking account of Carbon Reduction Plans (Feb 2025)
- BRE, GN51 LCA and embodied carbon for Mat 01 in BREEAM V7
- Green Badger, LEED v5 MRp2 prerequisite
- UKGBC, Whole Life Carbon Framework (May 2026)
- LETI
- RIBA, 2030 Climate Challenge
- Buildwise, EN 15978:2026
- Fieldfisher, the CMA's powers on environmental claims
- Dezeen, M&S Oxford Street demolition approved (Dec 2024)
General information, not legal or professional advice for a specific project. Check the current documents and the local planning authority before relying on it. Last updated 23 November 2026. Next review February 2027.
Whole life carbon FAQs
What is whole life carbon, in plain English?
It's all the greenhouse gas a building is responsible for over its life: making the materials, building it, looking after it, running it and finally taking it down. It is measured in kgCO₂e (kilograms of carbon dioxide equivalent), usually per square metre of floor area.
Embodied carbon is everything except the energy and water used to run the building, which is operational carbon. Upfront carbon is the part of embodied carbon emitted before handover. Whole life carbon is embodied plus operational.
Is a whole life carbon assessment a legal requirement?
Not nationally, in England. The Building Regulations only cover operational energy. In March 2026 the government rejected a Commons committee recommendation to make assessments mandatory, and in July a minister said it was "taking time to consider the right approach". Part Z, the industry's proposal for regulation, hasn't been adopted.
It is still required on plenty of projects, through planning (the GLA and some councils) or through the client: a certification target, an NHS or government brief, or a net zero claim.
Does my London scheme need one?
If it's referable to the Mayor, yes: an assessment on the GLA template at planning and again after construction, plus a Circular Economy Statement. The GLA encourages one on other major schemes.
If it isn't referable, check the borough. The City of London expects one under its Planning for Sustainability SPD, and Westminster's Retrofit first policy means retrofit options have to be explored before demolition is proposed. The draft London Plan adds upfront carbon targets for referable schemes, expected from March 2028.
Which method should we use?
The RICS Professional Standard, 2nd edition, which is based on EN 15978. The GLA (with its Box 1 differences), the NZCBS, BREEAM V7, the NHS and NISTA all build on it.
Do one assessment to the full RICS scope and report what each scheme asks for. Separate calculations for each scheme cost more and won't agree with each other.
Can we compare a LETI band with a GLA benchmark or an NZCBS limit?
Not directly. They count different life cycle modules and building elements. The NZCBS limit is upfront carbon only and leaves out external works and demolition, for example, while LETI has separate upfront and life cycle bands.
Always give the scope with a figure, for example "band B, upfront (A1-A5)". The scope table on this page shows what each one counts.
What can we call net zero carbon?
Only a building verified under the UK NZCBS can be called a Net Zero Carbon Aligned Building, and verification comes after 12 months in use at 80% occupancy or more. Before that, the only permitted wording is "targeting verification to the UK Net Zero Carbon Buildings Standard".
Misleading environmental claims to consumers can now cost up to 10% of global turnover in CMA fines, so agree the wording with the client early.
Where do retention and reuse show up in an assessment?
Retained elements carry no new A1-A5 emissions, and demolition and strip-out go in A5.1. The benefit of materials reused elsewhere is reported in module D, separately, and isn't deducted from the total. In London, the Circular Economy Statement should inform modules C3 and D.
M&S Oxford Street is the cautionary tale. Demolition was approved in December 2024, with the Secretary of State unable to reach a definitive conclusion on whether refurbishment would have less embodied carbon. A retention case is strongest when the comparison is made early and like for like.
Does our Carbon Reduction Plan cover this?
No. A PPN 006 Carbon Reduction Plan covers your company's own emissions, and you need one to bid for central government contracts over £5m a year. It doesn't measure the carbon of the buildings you deliver, which is what a whole life carbon assessment does.
When should the assessment start?
Before the design is fixed. The GLA wants the audit of existing buildings done before the massing is settled, BREEAM V7's early LCA is due within 20 working days of the planning submission, and NZCBS limits depend on the year works start.
The scope to cut carbon is biggest at the earliest stages, and it shrinks with every one after.
Services
Specialist capacity, without the headcount
Consultancy, contractor or in-house team with more certification work than people to deliver it? I plug in for as long as the work exists across commercial fit-outs and refurbishments. You keep the client. I do the certification work.
Licensed Assessor and AP
BREEAM services
Licensed Assessor for UK New Construction, and AP (Design and Site) from concept design to site.
SKA Assessor
SKA Rating services
Fit-out assessments, from scoping the measures to issuing the certificate.
WELL AP
WELL services
Route, scorecard and documentation, with the submission managed through IWBI review.
Fitwel Ambassador
Fitwel services
Scorecard set-up, evidence and submission, for new and existing buildings.
WiredScore AP
WiredScore services
Gap analysis, target level, evidence pack and improvement advice.
ActiveScore and ModeScore AP
ActiveScore services
Submission, score modelling and the improvements worth making.
Got a whole life carbon brief that needs a pair of hands?
Email or call me. Tell me where the site is, what stage it's at and what the client is aiming for, and attach drawings, a programme or a scope of works if you have them.
- Emailgeorge@welscape.co.uk
- Phone+44 7542 341750
